MIL-DTL-44285A
*4.4.5 Packaging examination. The fully packaged end items shall be examined for
marking, materials, workmanship and content defects.
4.5 Methods of inspection.
4.5.1 Delamination test. The interior and exterior of the left and right door panel surfaces
shall be tested by tapping them with the edge of a coin or material of like hardness. Each surface
shall be tapped in at least ten (10) places (excluding windows, door and window extrusions, hinge
covers and areas of the door within 1-inch of these exclusions). Any comparatively dull sound
shall be indicative of an area of delamination and shall constitute failure of this test.
PACKAGING
5.
*5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed
by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain
requisite packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activity within the Military Department or Defense Agency, or within
the Military Department's System Command. Packaging data retrieval is available from the
managing Military Department's or Defense Agency's automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
NOTES
6.
(This section contains information of a general or explanatory nature that may be helpful,
but is not mandatory.)
6.1 Intended use. The double bump through doors are intended to be used on Temper
tents and tactical rigid wall shelters to provide a door that swings both ways and that can be
locked open for free passage in and out of the shelters.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. Class of item required (see 1.2).
c. Issue of DODISS to be cited in the solicitation, and if
required, the specific issue of individual documents
referenced (see 2.1.1 and 2.2).
d. When first article is required (see 3.1, 4.2 and 6.4).
e. Levels of preservation and packing (see 5.1).
6.3 Sample. For access to standard sample, address the contracting activity issuing the
invitation for bids.
6.4 First article. When a first article is required, it will be inspected and approved under
the appropriate provisions of FAR 52.209. The first article should be a preproduction sample.
The contracting officer should specify the appropriate type of first article and the number of units
to be furnished. The contracting officer should include specific instructions in all acquisition
instruments regarding arrangements for selection, inspection, and approval of the first article.
6.5 Vestibule door cap. When double dump through doors are intended to be used with
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business