MIL-DTL-12354G
c. Apply two coats of the textile compound to the seams (on the outside of the tent only). A 4-
inch wide stiff brush is recommended for use. Allow the first coat to air dry for a minimum of 4 hours
prior to application of the second coat. Elapsed time between coats may be reduced by providing a
supply of hot air to evaporate the solvent more quickly. In this manner, apply second coat as soon as
the first coat is dry. After the application of the second coat, allow the treated tent to air dry for a
period of at least 24 hours.
6.4 Subject term (key word) listing.
Shelter
Pole Support
Liner
Extreme Cold /Cold Wet
6.5 International standardization agreements. Certain provisions of this document are the subject of
international standardization agreement as cited in NATO, STANAG No. 2882, relative to camouflage
requirements for tents, shelters and subsidiary components. When amendment, revision, or cancellation
of this document is proposed which will affect or violate the international agreement concerned, the
preparing activity will take appropriate reconciliation action through international standardization
channels including departmental standardization offices, if required.
*6.6 Changes from previous issue. The margins of this specification are marked with asterisks (*) to
indicate where changes from the previous issue were made. This was done as a convenience only and
the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and
contractors are cautioned to evaluate the requirements of this document based on the entire content
irrespective of the marginal notations and relationship to the last previous issue.
MILITARY 1NTERESTS:
Custodians:
Preparing activity:
Army-GL
DLA-CT
Navy-MC
Air Force-11
Review activities:
(Project 8340-0578)
Army-MD
Air Force-11.6
28
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business